Choosing a GC: Red Flags and Questions to Ask Before Signing a Contract

November 4, 2026
|
Case Studies

Your general contractor can make or break your project. On a fix & flip or ground-up build, the GC controls your timeline, your budget, and the quality of what you sell or rent. A bad hire means blown deadlines, extra interest, and change orders that eat your profit.

Quick answer: To choose a general contractor, verify their license and insurance, get at least three itemized bids, call recent references, and tie every payment to completed work. Walk away from any GC who asks for a large deposit up front, wants to skip permits, or pressures you to sign fast.

What are the red flags when hiring a general contractor?

  1. No license or insurance on file. If they can't show a current state license, general liability, and workers' comp, walk away. You can verify a Florida license in minutes on the DBPR website.
  2. A big deposit up front. A reasonable deposit covers mobilization and early materials. A GC asking for 30–50% before any work starts may be using your money to finish someone else's job.
  3. A bid way below everyone else's. A low number often means missing scope, cheap materials, or a plan to make it up later with change orders.
  4. Vague, one-page estimates. "Kitchen remodel – $45,000" tells you nothing. Real bids break out labor, materials, and each phase.
  5. They want to skip permits. Unpermitted work can kill your sale, your refinance, or your insurance claim. It's never worth the shortcut.
  6. No references or recent projects. A solid GC is proud to show past work and connect you with past clients.
  7. Pressure to sign today. "This price is only good until Friday" is a sales tactic, not a reason to rush.

Good to know: in Florida, a contractor who takes more than 10% of the contract price as a deposit must apply for permits within 30 days and start work within 90 days (Fla. Stat. 489.126).

Already have a GC lined up? Lendyx reviews your budget and scope before closing, so you know the numbers work before work starts. Get pre-qualified for a fix & flip or construction loan.

What questions should you ask a general contractor before signing?

Experience

  • How many projects like mine have you finished in the last two years?
  • Can I see photos and talk to two or three of those clients?
  • Have you worked with investors who use draw-based financing before?

Team and schedule

  • Who will be on site day to day, and how do I reach them?
  • Which trades do you use in-house vs. subcontract?
  • What's your realistic start date and finish date? What could delay it?

Money

  • What's your payment schedule, and is it tied to completed milestones?
  • How do you handle change orders, and how are they priced?
  • Do you provide lien waivers from subs and suppliers with each payment?

Paperwork

  • Who pulls the permits, and who schedules inspections?
  • What warranty do you offer on workmanship, and for how long?

What should a general contractor contract include?

If it isn't in writing, it doesn't exist. Before you sign, make sure the contract covers:

  • Detailed scope of work with materials, brands, and finishes spelled out
  • Line-item budget that matches your project budget
  • Start date, completion date, and what happens if they miss it
  • Payment schedule tied to milestones, not calendar dates
  • Change order process: written approval and pricing before any extra work
  • Permits and inspections: who is responsible
  • Lien waivers with every payment
  • Proof of license and insurance attached
  • Warranty terms and how to request repairs
  • Termination clause if the job goes off track

How does a construction lender protect you from a bad GC?

On a construction or rehab loan, your lender is a second set of eyes. Before closing, we review your budget and scope to make sure the numbers make sense for the project. During the build, funds are released in draws after work is inspected and verified, so your GC is paid for progress, not promises.

That structure protects you, too. If the work isn't done, the draw doesn't go out.

FAQs

How many bids should I get from general contractors?

Get at least three itemized bids for the same scope of work. Comparing line by line shows you who left items out, who is overpriced, and who is pricing low to win the job.

How much should a GC deposit be?

A typical deposit covers mobilization and early materials, often 10% or less. In Florida, a contractor who takes more than 10% must apply for permits within 30 days and begin work within 90 days.

How do I check if a contractor is licensed in my state?

Search the contractor's name or license number on your state's contractor licensing board website. Confirm the license is active and matches the company name on your contract.

What is a lien waiver and why do I need one?

A lien waiver is a signed statement that a sub or supplier has been paid. Collecting one with each payment keeps unpaid subs from filing a lien on your property.

Can my lender help me vet a general contractor?

Yes. With a construction or fix & flip loan, your lender reviews the budget and scope before closing and inspects work before releasing each draw. That gives you a second check on your GC.

How do construction loan draws work?

The loan funds the build in stages. After each phase is finished, an inspector verifies the work and the lender releases that draw, so your GC is paid for completed progress.

The bottom line

Take your time choosing a GC. Check their license and insurance, compare detailed bids, call their references, and get everything in writing. A few extra days of vetting can save you months of headaches.